Construction Quality and Document Control System

Construction Quality and Document Control System

July 21, 2026
3 min read
NepalBuild Admin
Building Materials

Connect drawings, submittals, RFIs, inspections, tests, nonconformities and handover records.

constructionadvanced

Connect drawings, submittals, RFIs, inspections, tests, nonconformities and handover records.

Construction Quality and Document Control System
Build Mart Nepal practical construction guide.

Control current information

Site teams should work only from approved and current drawings, specifications and method statements.

Plan inspections

Define hold points and required evidence before work starts.

Plan inspections
Construction planning reference for plan inspections.

Close nonconformities

Record cause, correction, verification and preventive action rather than simply hiding defects.

Build the handover file continuously

Do not wait until completion to collect certificates, tests, warranties and as-built records.

Use this in Build Mart Nepal

Turn the guidance into action by creating a project, loading a BOQ, matching local providers, issuing quotations and storing approvals in the Build Mart Nepal construction operating system.

Quick implementation checklist

  • Define the required outcome and acceptance evidence.
  • Assign an owner and target date.
  • Record quotations, approvals and changes.
  • Inspect completed work and retain handover records.