Construction Document Control for Drawings, BOQs and Approvals
Manage document numbers, revisions, status, recipients, superseded copies, approvals and site distribution to reduce rework.
Manage document numbers, revisions, status, recipients, superseded copies, approvals and site distribution to reduce rework.

Use one numbering and revision system
Every drawing, specification and schedule should be uniquely identifiable.
Show status clearly
Draft, submitted, approved and superseded documents must not be confused.

Control site distribution
Replace obsolete information and record who received the current revision.
Link decisions and changes
Keep comments, approvals and resulting revisions connected for audit and handover.
Use this in Build Mart Nepal
Turn the guidance into action by creating a project, loading a BOQ, matching local providers, issuing quotations and storing approvals in the Build Mart Nepal construction operating system.
Quick implementation checklist
- Define the required outcome and acceptance evidence.
- Assign an owner and target date.
- Record quotations, approvals and changes.
- Inspect completed work and retain handover records.
NepalBuild Admin
Content Team · BuildMartNepal.com — Nepal's construction materials marketplace
Similar articles
Construction Project Controls: Schedule, Cost, Quality and Risk
An integrated project-control framework for owners, consultants and contractors managing construction in Nepal.
Checklist for Buying Construction Materials Online in Nepal
Verify specifications, sellers, certification, delivery, payment and inspection before ordering construction products online.
BOQ Basics for Homeowners and Small Contractors in Nepal
Understand BOQ items, units, rates, provisional sums, variations and payment measurements before construction starts.
Construction Quotation Comparison: Price Is Not the Only Number
A practical method for comparing scope, specification, tax, lead time, warranty and exclusions across quotations.