Construction Document Control for Drawings, BOQs and Approvals

Construction Document Control for Drawings, BOQs and Approvals

July 17, 2026
3 min read
NepalBuild Admin
Building Materials

Manage document numbers, revisions, status, recipients, superseded copies, approvals and site distribution to reduce rework.

constructionadvanced

Manage document numbers, revisions, status, recipients, superseded copies, approvals and site distribution to reduce rework.

Construction Document Control for Drawings, BOQs and Approvals
Build Mart Nepal practical construction guide.

Use one numbering and revision system

Every drawing, specification and schedule should be uniquely identifiable.

Show status clearly

Draft, submitted, approved and superseded documents must not be confused.

Show status clearly
Construction planning reference for show status clearly.

Control site distribution

Replace obsolete information and record who received the current revision.

Keep comments, approvals and resulting revisions connected for audit and handover.

Use this in Build Mart Nepal

Turn the guidance into action by creating a project, loading a BOQ, matching local providers, issuing quotations and storing approvals in the Build Mart Nepal construction operating system.

Quick implementation checklist

  • Define the required outcome and acceptance evidence.
  • Assign an owner and target date.
  • Record quotations, approvals and changes.
  • Inspect completed work and retain handover records.